Wastewater Treatment Plant: Clinton, IA

  • Contract: $39,098,698.00
  • Completed: August, 2013
  • Owner: City of Clinton, IA
  • Engineer: HDR, Omaha, NE
  • Scope: New Wastewater Treatment Facility along with new influent pumping station.New pumping station was on separate site from new WWTF. New pumping station was large concrete structure with pumps, controls and building. New WWTF consisted of Head works building, with screening and grit removal, oxidation ditch bioreactors, secondary clarifiers, effluent pump station, aerobic digesters and solids handling / dewatering facilities. Along with associated site work, process piping, mechanical, electrical and instrumentation for both sites.
    Plant Capacity is 15 MGD