- Contract: $9,625,019.00
- Completed: July 2008
- Owner: TM Rual Water District, Dolton, SD
- Engineer: Banner Associates, Brookings, SD
- Scope: New Lime Softening Water Treatment Plant, including 15,000 sf cast-in-place and precast concrete construction. Associated lime feed equipment, carbon dioxide, on-site chlorination generation equipment, other various process piping, valves, equipment and pumps. Complete building finishes, plumbing, mechanical, electrical and controls.
Plant Capacity is 4.0 MGD