- Contract: $1,240,941.00
- Completed: June 2011
- Owner: City of Sioux Falls, SD
- Engineer: Howard R Green Company, Sioux Falls, SD
- Scope: Replacement of 2 vertical turbine can style pumps, relocating existing piping, fittings, and valves. Install new piping, fittings and valves. Related concrete, masonry, excavation, backfilling site piping, electrical and mechanical systems.
Plant Capacity was upgraded to 8.4 MGD
Archives for July 2013
Pressure Zone Improvements: Sioux Falls, SD
Posted By July 22, 2013 •
• Turner Street Pump Station Wastewater Treatment Improvements: Marshalltown, IA
Posted By July 22, 2013 •
• - Contract: $872,452.00
- Completed: October 2008
- Owner: City of Marshalltown, IA
- Scope: Construct new inverted siphon under Linn Creek, replace sewage pumps in existing lift station
Wastewater Treatment Plant Improvements: Brainerd, MN
Posted By July 22, 2013 •
• - Contract: $24,870,587.00
- Completed: December 2011
- Owner: Brainerd Public Utilities
- Engineer: Barr Engineering – Minneapolis, MN & BDM Consulting Engineers – St Paul, MN
- Scope: Addition, expansion and modifications to existing WWTP. New structures include: headworks building, SBR Facility, UV Disinfection Facility, Anaerobic Digesters, Sludge Storage Tank, and Sludge Thickening Facility. Structures consist of new precast buildings and cast in-place concrete tanks with associated mechanical and electrical services. Process equipment includes screening equipment, SBR equipment with blowers and pumps, UV equipment, digester equipment with covers and mixing systems, gravity belt thickeners and chemical feed systems.
Plant Capacity will be upgraded to 11 MGD